<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=192888919167017&amp;ev=PageView&amp;noscript=1">
Thursday, March 28, 2024
March 28, 2024

Linkedin Pinterest

Camas pavement restoration project scheduled to begin July 12

Camas starts its pavement restoration project next week, and a whole bunch of streets will be worked on

By Adam Littman, Columbian Staff Writer
Published: July 4, 2016, 7:01pm

The Camas Public Works Department will begin its annual pavement restoration project on July 12.

If weather permits, crews are expected to be out working on the roads through July 15, Denis Ryan, public works operations supervisor, said in an email. The exact schedule will be determined closer to the start of the project, Ryan said.

Crews have already started trimming vegetation and filling cracks in preparation. The slurry seal requires a one-day road closure.

All residents who live on streets scheduled for treatment should have received mail notification in late June, and door hangers will be placed one or two days in advance before work begins on their street.

The affected streets are:

• Northwest 10th Avenue between Forrest Home Road and Greeley Street.

• Northwest 11th Circle between its east cul-de-sac and Whitman Street.

• Northwest 12th Avenue between Oak Ridge Lane and Klickitat Street.

• Northeast 12th Avenue between Division and Birch streets.

• Northeast 13th Avenue between Division and Adams streets.

• Northwest 15th Avenue between Benton and Division streets.

• Northwest 18th Avenue between 18 Loop and the end of 18th Avenue.

• Northwest 19th Avenue west of Fargo Street.

• Southeast Second Avenue east of Franklin Street.

• Northeast Second Avenue between Cedar and Dallas streets.

• Northeast Third Place between Third Avenue and Oak Street.

• Northwest 30th Circle west of Gravenstein Street.

• Northwest 38th Avenue between Sierra Drive and Oregon Street.

• Northeast Fourth Avenue between Garfield and Ione streets.

• Northeast 40th Circle west of Hayes Street.

• Northeast 41st Avenue between Hayes and Ione streets.

• Northwest 41st Circle east of Sierra Drive.

• Northeast 42nd Circle west of Hayes Street.

• Southeast Seventh Avenue between Sumner and Union streets.

• Southeast Ninth Avenue east of Polk Street.

• Northwest Dahlia Drive between 38th and 42nd avenues.

• Northwest Dahlia Loop between both entrances onto Dahlia Drive.

• Northwest Elwood Court between Dahlia Loop and dead end of street.

• Northeast Hayes Street between Second and Third avenues, and between 38th and 43rd avenues.

• Northeast Ione Street north of 38th Avenue.

• Northwest Julia Street between cul-de-sac on 26th Avenue and Pacific Rim Drive.

• Northwest Leadbetter Boulevard between Lake Road and Walden Drive.

• Northwest Meriwether Court east of 12th Avenue.

• Northwest Mitchell Street between east and west intersections of Fifth Avenue.

• Northwest Ogden Street between 14th and 16th avenues.

• Southeast Polk Street between 11th and 12th avenues.

• Northwest Walden Drive east of Barlow Street.

• Southeast Whitney Street between East First Avenue and the railroad tracks.

• Northeast Whitney Street between East First Avenue and Northeast Second Avenue.

Adam Littman: 360-735-4518; adam.littman@columbian.com; twitter.com/a_littman

Loading...
Columbian Staff Writer