<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=192888919167017&amp;ev=PageView&amp;noscript=1">
Saturday,  April 27 , 2024

Linkedin Pinterest
News / Clark County News

Pavement repair work coming on Highway 500

By William Seekamp, Columbian staff writer
Published: July 19, 2023, 5:56am

Travelers on state Highway 500 can expect single lane and ramp closures from 7 a.m. through 3 p.m. starting Thursday as Washington State Department of Transportation maintenance crews do pavement repair work.

Pavement improvements include crack sealing, grinding, and leveling ruts, filling potholes and applying lane striping where needed, to smooth the driving surface and extend the useful life of the highway.

Paving work is weather dependent and may be paused at any time, due to inclement weather.

The closures will be at:

  • Thursday and Friday the eastbound Highway 500 offramp to Northeast Andresen Road will be closed.
  • Monday, the westbound Highway 500 onramp from Northeast Andresen Road will be closed.
  • Tuesday, the northbound I-205 offramp to Northeast 112th Avenue will be closed.
  • On July 26, the westbound Highway 500 onramp from Northeast 112th Avenue will be closed.
  • On July 27, the eastbound Highway 500 mainline at mileposts 0.9-1.5 will have the right lane closed and the onramp from Northwest 15th Avenue and the offramp from St. Johns Boulevard will also be closed.
  • On July 28, the eastbound Highway 500 mainline at mileposts 1-1.5 will have the right lane closed and the offramp from St. Johns Boulevard will also be closed.
Loading...