<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=192888919167017&amp;ev=PageView&amp;noscript=1">
Monday,  May 6 , 2024

Linkedin Pinterest

Tagged Articles:
Interstate 5 Bridge

The lift towers on the northbound span of the I-5 Bridge are pictured in Vancouver on Sept. 10, 2020.

Oregon wildfires put massive Interstate 5 Bridge repair project on hold

The lift towers on the northbound span of the I-5 Bridge are pictured in Vancouver on Sept. 10, 2020.

September 10, 2020, 7:59pm Clark County News

A massive project to rebuild a portion of the Interstate 5 Bridge was put on hold Thursday out of concerns that evacuees from Oregon wildfires would overwhelm the region’s freeway system. Read story

Half-hour nighttime bridge lifts planned

September 8, 2020, 5:59pm Clark County News

Drivers heading north on Interstate 5 should expect to encounter delays Wednesday night due to periodic northbound bridge lifts between 10 p.m. and 5 a.m., which will last for up to 30 minutes at a time. Read story

An employee from Long Painting Co. from Portland removed metal protectant and applied a light coat of grease to the a lift span counterweight sheave that was being installed atop the Interstate 5 Bridge in 1997.

Looking back at 1997 Interstate 5 Bridge repair as upcoming project looms

An employee from Long Painting Co. from Portland removed metal protectant and applied a light coat of grease to the a lift span counterweight sheave that was being installed atop the Interstate 5 Bridge in 1997.

September 8, 2020, 6:05am Clark County News

Boats transported parcels from one side of the river to the other. A fatal crash snarled traffic for hours. A contractor’s speedy repair job finished the project in a third of the expected time. Read story

The Interstate Bridge is seen looking north from the Oregon side in 2017.

Interstate Bridge closure: Plan for life without the span

The Interstate Bridge is seen looking north from the Oregon side in 2017.

September 6, 2020, 6:05am Business

9-day closure of I-5 Bridge northbound side is 6 days away, and being prepared will help ease expected traffic backups Read story

I-5 Bridge overnight lane closures continue

August 28, 2020, 6:00am Clark County News

Drivers should expect to encounter nighttime lane closures and longer bridge lifts on the Interstate 5 Bridge in the coming week, according to the Oregon Department of Transportation. Bikers and pedestrians may also encounter intermittent closures of the northbound bridge sidewalk, and will need to detour to the sidewalk on… Read story

Northbound I-5 Bridge to close for two hours Saturday

August 21, 2020, 6:01am Clark County News

The northbound span of the Interstate 5 Bridge will close to all traffic from 1 to 3 a.m. Saturday due to preliminary work related to the upcoming trunnion replacement project in September, according to a press release from the Oregon Department of Transportation. Read story

Replacement parts for the Interstate 5 Bridge&#039;s lift mechanism were custom-built in Alabama and shipped to Oregon. They arrived at the bridge via barge on Aug. 4 and will be installed during a nine-day closure of the bridge Sept. 12 to 20.

Peripheral projects wrap up as crews prep for I-5 Bridge trunnion project

Replacement parts for the Interstate 5 Bridge&#039;s lift mechanism were custom-built in Alabama and shipped to Oregon. They arrived at the bridge via barge on Aug. 4 and will be installed during a nine-day closure of the bridge Sept. 12 to 20.

August 20, 2020, 6:00am Clark County News

The big Interstate 5 Bridge trunnion replacement project is less than a month away, and motorists will soon see more preparation and testing work as C-Tran and two state transportation departments count down to the Sept. 12 start date. Read story

Motorists cross the Interstate 5 Bridge from Portland into Vancouver. Bridge traffic levels declined sharply during the first weeks of the coronavirus pandemic, but they&#039;ve begun to recover -- and traffic officials say commuters should still plan for severe congestion in September when the northbound bridge span will close for maintenance for up to nine days.

Interstate 5 Bridge lane closures about to begin

Motorists cross the Interstate 5 Bridge from Portland into Vancouver. Bridge traffic levels declined sharply during the first weeks of the coronavirus pandemic, but they&#039;ve begun to recover -- and traffic officials say commuters should still plan for severe congestion in September when the northbound bridge span will close for maintenance for up to nine days.

August 14, 2020, 6:05am Clark County News

Nighttime lane closures will begin next week on the Interstate 5 Bridge, according to a press release from the Oregon Department of Transportation, in preparation for the planned trunnion replacement project in September. Read story

A person watches from the bank of the Columbia River as the trunnion, sheaves and other replacement components for the Interstate 5  Bridge arrive in Vancouver via barge on Tuesday morning.

Trunnion, sheaves for September repair of Interstate 5 Bridge span arrivevideo icon

A person watches from the bank of the Columbia River as the trunnion, sheaves and other replacement components for the Interstate 5  Bridge arrive in Vancouver via barge on Tuesday morning.

August 5, 2020, 6:05am Business

The Interstate 5 Bridge trunnion replacement project won’t begin in earnest until September, but preliminary work is already underway at the site, including the Tuesday morning arrival of a barge carrying the new sheaves, trunnion and other replacement components for the bridge’s lift system. Read story

Hundreds of demonstrators take a knee for one minute to honor Black lives lost to police violence on the Interstate 5 bridge Friday afternoon, June 19, 2020.

Demonstrators march on Interstate 5 Bridge

Hundreds of demonstrators take a knee for one minute to honor Black lives lost to police violence on the Interstate 5 bridge Friday afternoon, June 19, 2020.

June 19, 2020, 4:07pm Clark County News

Hundreds of demonstrators commemorating Juneteenth marched Friday afternoon from Esther Short Park to Interstate 5, where they occupied the Interstate 5 Bridge and took a knee in honor of George Floyd and to promote the end of racism in the United States. Read story